Federal Circuits, 6th Cir. (May 31, 1955)
Docket number: 12130
Permanent Link:
http://vlex.com/vid/british-london-underwriters-roylance-whittall-36652136
Id. vLex: VLEX-36652136
Click here to download this article in graphic format (Acrobat Reader)
Ohio Supreme Court - Hubbell v. Xenia (Ohio 2008)
Craig Spangenberg, Cleveland, Ohio, argued, M. C. Harrison, Harrison, Spanggenberg & Hull, Cleveland, Ohio, Francis D. Butler, St. Paul, Minn., on the brief for appellants.
Edward D. Crocker and C. M. Horn, Cleveland, Ohio, argued, Arter, Hadden, Wykoff & Van Duzer, Victor DeMarco, Jones, Day, Cockley & Reavis, Cleveland, Ohio, on the brief for appellee.Before SIMONS, Chief Judge, and McALLISTER and STEWART, Circuit Judges.STEWART, Circuit Judge.This was an action for damages brought by appellant, hereinafter referred to as 'Northwest,' a commercial airline company, against appellee, hereinafter referred to as 'Martin,' a manufacturer of airplanes.1 The action was based upon Martin's alleged negligence in the design and manufacture of five 'Model 202' airplanes purchased by Northwest, resulting in the loss of one of the planes and the temporary loss of use of four others. No questions of warranty are involved, since the purchase agreement in effect limited Martin's liability to that imposed on it by law for its negligence.The trial lasted approximately three months. The jury deliberated for ten days before returning general verdicts in favor of Martin.2 The appendices on appeal number more than two thousand pages. We are told that the case is one of great importance not only because of its immediate impact upon the rights and liabilities of the parties, but perhaps even more so because of its supposed impact upon the airline and aircraft industries, and the relationships between them. Yet the case remains a negligence action, involving for the most part issues of fact, prolix and technical though they be. From this thick overlay of factual controversy emerge familiar questions of ordinary care, proximate cause, contributory negligence and assumption of risk.Martin is a Maryland corporation, with its plant and offices near Baltimore. It has been engaged in the design and manufacture of airplanes since 1909. Throughout World War II Martin devoted its efforts completely to the designing and building of military planes, as did the entire aircraft industry. It be came apparent in the closing days of the war that the post-war period would provide a large potential market for modern, economical commercial transport planes. Martin decided to enter this market, and accordingly embarked upon the design of the '202,' a fast, two-engine airplane which would incorporate many of the engineering and manufacturing advances made during the war period. Commencing early in 1945 the project moved ahead until by 1946 more than five hundred of Martin's designing engineers were working on the '202.'Some time in the summer of 1946, Northwest decided to purchase ten Martin 202's. The formal contract was not signed until February 24, 1947, but it was dated August 31, 1946, and the evidence shows that Northwest's decision to purchase the planes had been made in June of 1946. These ten airplanes were delivered to Northwest in 1947, and they proved so satisfactory that Northwest decided to buy three more 202's and signed the contract for their purchase on December 23, 1947. Northwest made subsequent purchases, so that it owned and was operating a fleet of twenty-five Martin 202's on August 29, 1948, the date on which occurred the dramatic events which provide the immediate background of this case.At 3:50 p.m. on that day a Northwest 202 airplane, identified hereinafter as 'No. 44,' took off from Chicago on a regularly scheduled non-stop flight for Minneapolis. It carried thirty-three passengers, a pilot, co-pilot and stewardess. No. 44 was one of the original ten 202's purchased from Martin, and, at the time of taking off, had flown a total of 1,321 hours, or about five per cent of its expected service life. So far as was then known, the airplane was in perfect condition.During its flight the plane maintained routine operational radio contact with the ground, and at 4:55 p.m. it reported that it was over La Crosse, Wisconsin and estimated that it would arrive over the Hastings marker (near Minneapolis) at 5:21 p.m. The plane was authorized to commence its descent so as to pass over the Hastings marker at an altitude of 2,500 feet and was directed to report when it passed through the 7,000 foot level on its descending path. At 4:56 p.m. the pilot radioed that he was beginning his descent and at 4:59 p.m. he advised that he was passing through the 7,000 foot level. No further messages were received from No. 44.At about this time the plane was observed by witnesses on the ground proceeding into a violent thunderstorm. A few minutes later, at approximately 5:05 p.m., the left wing tore off, and the airplane crashed near Fountain City, Wisconsin, a few miles to the northeast of Winona, Minnesota. All of the passengers and crew were killed. Subsequent investigation revealed that the immediate cause of the crash was the breaking of a front wing spar in the left wing at the point where the outer section of the wing was attached.Later the same day, when all that was known of No. 44 was that it was overdue, another Northwest 202, hereinafter referred to as 'No. 42,' was flown on a regularly scheduled round-trip flight from Minneapolis to Duluth. No 42 was also one of the original ten 202's purchased from Martin by Northwest. It too had flown only a small fraction of its expected service life. The weather was fair, the air smooth, and the trip uneventful, except that the pilot noticed that in order to keept the plane in level flight, it required a somewhat unusual amount of extra 'trim tab.' After the pilot landed No. 42 in Minneapolis, he made a routine report, including a statement about the unusual trim conditions which he had encountered, and then got into his automobile to drive home. Fortunately, however, he changed his mind and returned to the ramp where No. 42 was parked. He located the head of the Northwest inspection crew, told him in detail what he had noticed on the trip to Duluth, and urged that the plane be carefully examined before being allowed to depart on its next trip. Accordingly, the inspectors did make a thorough examination and found that a joint in the right wing of No. 42 was completely broken, and that the wing was being held in place only by its 'skin.' It was the same side of the same step of the same joint that had broken in No. 44.By this time Northwest had learned of the crash of No. 44, and its remaining twenty-three 202 airplanes were immediately grounded and thoroughly inspected. The inspection of these airplanes was made jointly by Northwest and Martin. The wings of the airplanes were all disassembled, and it was discovered that of the four remaining airplanes which had flown in excess of 1,200 hours, all had fatigue cracks in the wing joints, exactly where the wings of 44 and 42 had broken. Of the fifteen airplanes which had flown between 500 and 1,200 hours, seven were found to have fatigue cracks in the same wing joint. Of the four airplanes which had flown less than 500 hours, no such fatigue cracks were found. It is conceded that the broken parts of the wing joints of Nos. 44 and 42 which caused the loss of the first plane and damage to the second were caused by failures which began and developed as fatigue cracks. It is further conceded that the expected safe service life of the 202 had been between twenty-five and thirty thousand hours. All of Northwest's 202's were subsequently rebuilt in two successive phases, and the danger of premature fatigue failures in the wing joints was successfully eliminated.Northwest then brought this action for damages resulting from the loss of No. 44 and for the loss of use of No. 42 and three other 202's during the time they were being repaired. It was Northwest's contention that the fatigue cracks were the direct result of Martin's negligence in a number of different respects in the design and manufacture of the 202 airplanes.In order properly to understand this contention, it is necessary to review briefly the evidence as to the cause and nature of fatigue in metal. Fatigue is the phenomenon by virtue of which a metal part will eventually crack and break under repeated loads, each one of which is less than its tensile strength for one load. Three of the factors which affect fatigue life are, first, the kind of metal; second, the amount of repeated load as related to the strength of the metal for one load; and third, the configuration and surface condition of the metal.It is known that a metal which is smooth and highly polished is less subject to fatigue than one with a rough finish or the surface of which is marred by a scratch or notch. A rough surface is called a 'stress raiser.' Abrupt changes of section in the metal are also 'stress raisers,' as are notches and bolt holes. It is stress concentration which is the fundamental cause of fatigue failure.The fatigue life of some metals seems to be much more affected by stress raisers than does that of others. Those metals are said to be 'notch sensitive.' The Martin 202 was made from an aluminum alloy called 75ST, which was known to be much more notch sensitive than the alloy 24ST which had been used before 75ST was developed.It was Northwest's contention that the wing joints which cracked and broke in Nos. 42 and 44, and which cracked in the other airplanes, had a number of unnecessary stress raisers which were the result of Martin's negligence in design and manufacture, and that it was these stress raisers which caused the premature fatigue failure at the bottom of the fourth step at the outer end of the front spar of the center wing. Northwest alleged that Martin was negligent in the basic design of the wing joint, in entrusting the design to an incompetent designer, in failing to provide proper fatigue testing of the wing joint, in using aluminum alloy 75ST where unusual stress raisers were present, in failing to make computations of the secondary or eccentric stresses in the wing joint, in failing to make strain-gauge tests of the wing joint, in violating certain Civil Aeronautics rules, and in making certain misrepresentations to the Civil Aeronautics Administration.It was the position of Martin that it had used not only ordinary care, but very great care in the design and manufacture of the 202 airplanes. It contended alternatively that if there were a finding that it was negligent, Northwest had assumed the risk of danger or was guilty of contributory negligence.Beyond what has been said, there seems little point in attempting to review in detail the evidence as to Martin's negligence. Evidence was adduced on its behalf to show the great care with which the 202 was designed, manufactured, and tested. Evidence was adduced on behalf of Northwest to show that Martin should have known that the wing joint as designed and manufactured, and in view of the alloy from which it was made, was vulnerable to premature fatigue failure. Martin sought to meet Northwest's contentions by showing that the phenomenon of fatigue was an elusive and little understood one at the time these airplanes were designed and manufactured, and that in the light of the then state of the art very reasonable precaution was taken to guard against fatigue failure.On this fundamental aspect of the case it is Northwest's position on this appeal that the district court should have found that Martin was guilty of negligence as a matter of law. We cannot accept this contention. The effect of the voluminous evidence was certainly to leave the question of Martin's lack of ordinary care in a state upon which reasonable minds could differ. Indeed the question appears to us to be an extraordinarily close one. That being so, the trial court was entirely correct in submitting that question to the jury.Two further contentions of Northwest, however, raise considerably more serious questions. First, it is insisted that the trial court was in error in submitting to the jury the issue as to whether Northwest was barred from recovery because of its assumption of the risk of danger inherent in the defective wing joint in all five airplanes. Second, it is urged that the court was likewise in error in submitting to the jury the issue as to whether Northwest was guilty of contributory negligence with respect to all five airplanes. We shall discuss these contentions in the order presented.Assumption of RiskIt is Northwest's position that the evidence of record did not support a submission of the issue of assumption of risk to the jury at all. Northwest also claims that the issue was in any event not correctly stated in the instructions as given by the trial court. If Northwest is correct in its first contention, its second contention need not be considered.The parties seem to be in agreement that in order to find that Northwest had assumed the risk of danger resulting from the defective wing joint, the jury would be required to find that Northwest had voluntarily, knowingly, and intelligently assumed the risk of that danger, or that the danger was so obvious that Northwest must be taken to have done so. Morris v. Cleveland Hockey Club, 1952, 157 Ohio St. 225, 105 N.E.2d 419; Masters v. New York Central R. Co., 1947, 147 Ohio St. 293, 70 N.E.2d 898; Knipfer v. Shaw, 1933, 210 Wis, 617, 246 N.W. 328, 247 N.W. 320.The evidence showed that during the period that the original ten 202's were being built for Northwest a Northwest resident engineer, two or three Northwest inspectors, and a group of Northwest pilots and various other personnel were stationed at the Martin plant. In addition to these Northwest employees who were in residence at the Martin plant as part of Northwest's so-called 'Martin Procurement Project,' a number of other Northwest employees, including officers and technical personnel, made frequent visits to the Martin plant. Their purpose in being there was at least twofold, first, to familiarize themselves with the characteristics and specifications of the new airplanes, and secondly, to see to it that the airplanes as manufactured conformed not only to Martin's specifications, but also to Northwest's standards and operating needs, not only in such major matters as safety, but in various minor respects, such as the design of the interior of the cabins and the location of washroom facilities. Northwest's agents therefore were in a position to observe and actually did observe the day-by-day manufacture of the airplanes. They were in a position to recommend and actually did recommend various changes in design and manufacture.In the light of these circumstances the district court instructed the jury that it could consider whether or not Northwest had assumed the risk of danger resulting from (a) the basic design of the wing joints, (b) the material used (75ST) in the light of this design, (c) faulty workmanship or manufacture, and (d) the inadequacy of inspections and tests carried out by Martin. The jury was instructed that is finding that Northwest had assumed any of these risks would require a verdict for Martin.As to Northwest's assumption of the risk inherent in the alleged faulty design, Martin insists that the Court was correct in submitting that question to the jury, particularly in view of the testimony of a witness called by Northwest who testified that the respects in which the design of the wing joint was dangerous and defective would, after a few minutes examination, be open and obvious to any competent engineer. This witness was a retired employee of the National Bureau of Standards. He was not and never had been an employee of Northwest. His testimony was at variance with the great weight of the evidence which showed that the problem of design from the point of view of fatigue danger was far from completely understood in 1947. However, even accepting this testimony at its face value, there is no evidence that any competent Northwest engineer ever gave the wing joint any such examination. Those portions of the record to which counsel for Martin has directed this court's attention refer instead to the careful scrutiny that was given by both Martin and Northwest personnel to the design and installation of a wing wedge which was installed to give additional dihedral to the wings, after the initial test flights of the airplane in 1947 had shown it lacked stability. The wing splice was designed in had any connection with the Martin 202. Similarly, references to testimony by Northwest personnel of their knowledge that the metal 'skin' of all airplanes might develop cracks lends no support to Martin's contention that Northwest knew of the dangerous design of the wing splice here involved.As to Northwest's alleged assumption of the risk of possible danger in the use of the material 75ST, counsel for Martin calls our attention to evidence that a chemical engineer employed by Northwest had read and was familiar with certain scientific literature indicating that 75 ST was an unusually notch sensitive material. There was no evidence that this witness was connected with the Martin Procurement Project or was familiar in any way with the design of the wing splice, and it was not Northwest's position that Martin was negligent in the use of 75ST per se, but rather in the use of that material in the wing splice as actually designed and manufactured.As to Northwest's alleged assumption of the risk of danger resulting from poor workmanship and inadequate inspection, it is pointed out by Martin that the Northwest representatives present at the Martin plant had ample opportunity to observe and criticize the manufacturing and inspection procedures at all times. Martin emphasizes that, although the Northwest representatives did insist upon changes in other details of the airplane during its manufacture, such as hinge bolts, they made no objection to the workmanship or manufacture of the faulty splice, nor did they request that additional inspection or testing of the wing joint be undertaken, although they had a right to do so. Indeed, the evidence shows that Northwest fully approved the tests as made.This evidence not only falls short of providing a foundation for inferring assumption of risk, but on the contrary leads to the inference that Northwest did not know of or in any was appreciate a risk of danger in the alleged faulty manufacture and inadequate testing of the wing joint. The evidence that Northwest's representatives did insist upon changes whenever they saw any reason to be dissatisfied leads to the conclusion, at least by negative implication, that they saw no reason to criticize the wing joint. They had no reason whatever not to object to anything they might regard as hazardous, and, in fact, had been expressly instructed by Northwest to insist upon any changes they thought would increase the safety of the airplanes.In short, we believe that there is a complete absence of any evidence that Northwest, at any time prior to August 29, 1948, had knowledge or appreciation of any risk of danger associated with the design, the material, the workmanship, or the tests of the faulty wing joints in the 202 airplanes. There is no evidence that the danger lurking in the wing joint was so obvious to those Northwest representatives who actually did observe it that they must be taken to have appreciated that danger. We conclude that it was error to submit to the jury the question of Northwest's assumption of risk in the case.Contributory NegligenceNorthwest makes no objection to the form of the district court's charge on the question of contributory negligence. It is Northwest's position, however, that the trial court was in error in submitting the issue of contributory negligence to the jury at all, first, because that issue was not pleaded, and, secondly, because there was no evidence in the record to justify submission of that question to the jury. If Northwest is correct in its second contention, its first contention need not be considered.Martin concedes that there was no evidence of any negligence on the part of Northwest with respect to the maintenance and handling of the airplanes after they were delivered to Northwest. Martin insists, however, that there was evidence sufficient to submit to the jury of Northwest's contributory negligence prior to the time the airplanes were completed and delivered.3 The evidence to which our attention is directed is the same evidence upon which Martin bases its claim of Northwest's assumption of risk. Martin argues that the difference between assumption of risk and contributory negligence as delineated in the cases is merely one of degree-- between risks so obvious they must be taken to have been known to the plaintiff and those slightly less obvious which the plaintiff might have discovered by the exercise of ordinary care. Masters v. New York Central R. Co., Morris v. Cleveland Hockey Club, Knipfer v. Shaw, all cited above.Specifically, Martin again calls our attention to the fact that many representatives of Northwest were present throughout the period that the airplanes were manufactured and tested, and argues that in the exercise of ordinary care at least one of these representatives should have seen and appreciated the dangers and hazards in the wing splice.It is conceded by Martin that 'if Northwest had simply relied on Martin to produce a safe and sound airplane and had taken no further interest in the matter, there would be no issue here of contributory negligence.' That in any event seems to be the law. One need not anticipate the negligence of another until he becomes aware of such negligence. Baldridge v. Wright Gas Co., Inc., 1951, 154 Ohio St. 452, 96 N.E.2d 300 (Syl. 1).4 It is not contributory negligence to fail to look out for danger when there is no reason to apprehend any. Standard Oil Co. v. Burleson, 5 Cir., 1941,Try vLex for FREE for 3 days
Access legal information from United States including:
Try vLex without any commitment for 3 days and see why you need it.
3
days of Free Access